Futur Labs
Custom ERP for Manufacturing

Custom ERP built around your production floor.

An order changes. The schedule, materials, and promised date need to change with it. Connect the office and production floor around the same work orders, while keeping the systems your team depends on.

Futur Labs / Manufacturing
Your operation, connected

Work order · Assembly run

Sales → Planning → Production
01
Plan productionConfirm the order → Release the work
02
Control materialsReserve materials → Approve purchasing
03
Close the jobRecord completion → Reconcile costs
Shared record
OwnerStatusHistory
  • Built around your workflow
  • Connected to existing tools
  • Phased rollout
  • Code owned by you
Where work gets stuck

Start where the handoff breaks down. Keep what works. Connect the records, decisions, and people that move the work forward.

The schedule lives in someone's head.

A rush order changes the plan, but purchasing and the floor are still working from yesterday's version.

Stock exists. The right material doesn't.

Available stock, allocated parts, and supplier dates sit in separate places. The shortage appears when the job starts.

You find the margin after the job.

Labour, scrap, and material changes reach finance too late to see which orders need attention.

Where to start

Three workflows. One connected operation.

Explore a starting point for manufacturing. These are possible workflows to assess against your actual systems, rather than a fixed package of modules.

A promise the floor can work to.

When it helps

Planners are matching orders, machine time, and available people by hand.

Examples
  • Work orders
  • capacity planning
  • schedule changes
A first workflow

An approved order becomes a work order. Planning checks capacity and materials before publishing a release date.

In practiceIllustrative
Futur Labs / Manufacturing
One connected workflow

Plan production

Sales → Planning → Production
  1. 01Confirm the order
  2. 02Check capacity
  3. 03Release the work
Shared record
OwnerStatusHistory
What to measure

Schedule changes, late starts, and time spent reconciling the plan.

Scope with your team

Start at the operational layer around existing machines, MES, and accounting. Equipment access, planning constraints, and quality requirements need discovery before selecting the integration or release approach.

Your existing tools

Keep the systems that earn their place.

The ERP can connect the gaps around your current tools. We agree which system owns each record, what can move between them, and who resolves a failed update.

Connections to assess

  • QuickBooks Online
  • Xero
  • ShipStation
  • EDI (X12 850/856/810)
  • Barcode scanners (Zebra, Honeywell)
  • MES platforms

Availability depends on provider access, permissions, data quality, and the workflow we agree.

A connected operation in practice

Reliable Training is a training-business client build. It shows how scheduling, payments, and records can connect around one operation; your industry workflow would be scoped separately.

Built by Futur Labs
Reliable Training Services

A training business.
An entire operation,
connected.

Reliable Training ran on forms, calendars, spreadsheets, and bookings handled by hand. We built a custom ERP connecting the work from registration through certification.

The starting point
Separate tools. Manual bookings. A person keeping everything in sync.
What we built
Scheduling, payments, accounting, and certifications in one connected system.
Explore the Reliable Training build
Migration, rollout & adoption

Your business keeps running while the system changes.

  1. 01

    Agree the first workflow

    Map the handoffs with your team. Plan production may be a starting point; agree the owner, scope, and success checks before building.

  2. 02

    Build a usable first release

    Review working software each week. Target the agreed first workflow in 3–4 weeks once scope, access, and data are ready.

  3. 03

    Rehearse the data move

    Map source records, identify cleanup, and test the migration. Your team checks the records and totals against the original systems.

  4. 04

    Test with the people using it

    Run real tasks, exceptions, permissions, and handoffs. Train the team and agree whether parallel operation is needed.

  5. 05

    Make a controlled transition

    Set the cutover window, acceptance checks, and rollback approach. A named decision-maker approves the move into daily use.

  6. 06

    Support, then expand

    Monitor the live workflow, resolve issues, and review the results. Add the next module against an agreed roadmap.

Plan the investment

One model. Sized to your speed.

A senior engineering team on a monthly basis, sized to how fast you want to move. Any tier can work through the same ERP roadmap. A smaller team takes more months; a larger team moves more of it forward at once.

Small team

$7k
a month · steady progress
Timeline

An agreed first release, then weekly progress

Best for

Work through the full roadmap in priority order at a steady monthly budget.

Included
  • An agreed first release and a prioritised roadmap
  • Weekly working-software reviews
  • Integrations and data migration within the agreed scope
  • Team training and a controlled rollout
  • Hosting, monitoring, backups, and security updates while we work together
  • Code owned by you from the first commit

Growing

$13k
a month · more work moving at once
Timeline

An agreed first release, then weekly progress

Best for

Add capacity to move the build, integrations, and rollout forward together.

Included
  • An agreed first release and a prioritised roadmap
  • Weekly working-software reviews
  • Integrations and data migration within the agreed scope
  • Team training and a controlled rollout
  • Hosting, monitoring, backups, and security updates while we work together
  • Code owned by you from the first commit

Scale

$18k+
a month · faster delivery in parallel
Timeline

An agreed first release, then weekly progress

Best for

Bring more of the same roadmap forward with parallel workstreams and one delivery plan.

Included
  • An agreed first release and a prioritised roadmap
  • Weekly working-software reviews
  • Integrations and data migration within the agreed scope
  • Team training and a controlled rollout
  • Hosting, monitoring, backups, and security updates while we work together
  • Code owned by you from the first commit

Three-month minimum, thirty days' notice. You own the code from the first commit.

Ownership & ongoing operation

A system you can keep building on.

Your code and your data

You own the repository from the first commit. We document the system and the decisions behind it so the knowledge stays with the business.

Clear control of the accounts

Agree where the system runs, who holds the credentials, and who manages each integration. Access and a handover plan are part of the setup.

Support after the rollout

Hosting, monitoring, backups, and security updates are included while we work together. We agree the support responsibilities as the system moves into daily use.

Access that fits the operation

Define who can see, change, and approve information. Plan permissions, audit trails, and recovery around your requirements, with specialist review where the workflow needs it.

Questions & Answers

Clear answers
for complex builds.

Clear answers on timelines, pricing, ownership, and what shipping actually looks like with a senior engineering team.

  • Start with a handoff your team can describe and measure. For example: An approved order becomes a work order. Planning checks capacity and materials before publishing a release date. We review the existing tools, exceptions, and data before agreeing the first release.

  • No. We compare keeping, connecting, and replacing each part of the workflow. If a packaged platform already covers the work well, we can build the missing integration or operational layer around it. A custom ERP becomes useful when shared records and business-specific processes need to work together.

  • Start at the operational layer around existing machines, MES, and accounting. Equipment access, planning constraints, and quality requirements need discovery before selecting the integration or release approach.

  • We map the source records, test the move, and ask your team to check the results. The rollout starts with an agreed workflow and group of users, with acceptance checks and a rollback approach. Further modules follow once the first release is working in daily use.

  • The monthly team starts at $7k, with $13k and $18k+ options for more capacity. Any tier can work through the same roadmap; more capacity changes how much can move at once. Total investment depends on the scope, dependencies, and number of months. There is a three-month minimum.

  • You own the code from the first commit. Hosting, monitoring, backups, and security updates are included while we work together. We document the system, agree account ownership and support responsibilities, and plan a handover if another team takes over.

Talk through your manufacturing operation

One call. Bring the workflow.

Show us the handoff, the spreadsheet, or the system your team works around. We’ll discuss what to keep, what to connect, and a useful first release.

Or email hello@buildfutur.com